Peter Lalor Secondary College

  • Address
    118 David Street,
    Lalor, VIC
    Type

    Commercial

    Year

    2024

  • Team

    Project Manager
    Kevin Maher

    Size

    1,450m2

    Cost

    $1.2m

Project Information

Our team installed multiple products on the job, including 800m² of 8mm Genesis Raw CFC Sheets in three colours. We also installed 250m² of Vitradual 3mm solid aluminium in a dark grey metallic finish and provided the caulking service. Additionally, we installed 400m² of Keystone Kompress solid and perforated MDF substrates in a Hoop Pine finish with a clear satin coating. Several components of the project were manufactured and installed by Castle, including the fabrication and installation of a custom balustrade system that incorporated screens and glass into a fully engineered solution. Finally, we designed and manufactured Silvertop Ash timber battens, which were fixed onto Castle’s custom service enclosures, screens, and doors. These efforts highlight our ability to deliver tailored solutions that meet the unique needs of each project.

800m² of Cement Sheets

– Manufacture and installation of Genesis Raw CFC Sheets in 3no colours

250m² of Solid aluminium Cladding

– Installation of 250m² of 3mm Vitradual supplied in Dark Grey metallic finish
– Additional Caulking service provided

400m² of MDF Substrate

– Installation of 400m² of Keystone Kompress Solid and perforated MDF Substrate
– Supplied in Hoop pine finish and Satin/Clear

Custom Balustrade

– Custom Manufactured and installed balustrade system
– Fully engineered system incorporating perforated screens and glass

Timber Battens

– Silvertop Ash Battens fixed onto custom service enclosures screens and doors
– In-house custom design, manufacture and installation of timber battens

Back to all Projects